Skip to content
ANU News ANU News
ANU News ANU News
  • Home
  • Home
ANU News ANU News
ANU News ANU News
  • Home
  • Home
Regional

‘Assess impact on Metro, suburban rail’: Tejaswi Surya flags concerns over Hebbal tunnel

By ANU News
August 13, 2026 2 Min Read
0

Bengaluru: BJP MP Tejaswi Surya has urged Chief Minister D.K. Shivakumar to halt further progress on the proposed Hebbal short tunnel project until a comprehensive scientific and technical assessment is carried out.

The project, being undertaken by the Bangalore Development Authority (BDA) to ease traffic congestion, is estimated to cost around ₹1,140 crore. The proposed tunnel, measuring about 2.2 km, is planned between Hebbal Junction and the Karnataka Veterinary, Animal and Fisheries Sciences University (KVAFSU). Around 3.45 acres of Hebbal Lake land is reportedly being transferred for the project.

In a letter to the Chief Minister, Surya raised concerns over the tunnel’s possible impact on the proposed Metro Red Line and suburban railway projects. He also alleged that the project was taken up without obtaining the required approval from the Bangalore Metropolitan Land Transport Authority (BMLTA).

The Bengaluru South MP said several civic groups had raised objections and submitted petitions against the project, but claimed that adequate consultations had not been held with stakeholders.

Surya has called for a detailed traffic simulation study and an independent technical assessment by the Indian Institute of Science (IISc) before the project proceeds further. He has also sought the views of the Directorate of Urban Land Transport (DULT) and BMLTA under the Urban Development Department.

He said Bengaluru’s future transport infrastructure should be planned based on scientific studies, expert recommendations and an integrated multimodal transport strategy.

According to Surya, infrastructure projects should address the city’s long-term mobility requirements rather than provide only short-term relief from congestion.

The ₹1,140 crore Hebbal Short Tunnel project should not proceed without a scientific assessment.

Experts have raised serious concerns over the project's design, safety, and integration with Bengaluru's long-term mobility network. The project also passes through Hebbal Lake… pic.twitter.com/TDXohEo8KY

— Tejasvi Surya (@Tejasvi_Surya) August 12, 2026

Author

ANU News

Follow Me
Other Articles
Previous

ಹೆಬ್ಬಾಳ ಶಾರ್ಟ್ ಟನಲ್ ಯೋಜನೆಗೆ ತೇಜಸ್ವಿ ಸೂರ್ಯ ವಿರೋಧ; ವೈಜ್ಞಾನಿಕ ಅಧ್ಯಯನಕ್ಕೆ ಆಗ್ರಹ

Next

Monsoon intensifies across India; heavy rain forecast in several states, Delhi too

No Comment! Be the first one.

    Leave a Reply Cancel reply

    Your email address will not be published. Required fields are marked *

    Recent Posts

    • ಸುಂದರ್ ಪಿಚೈ ‘ಮಾನ್‌ಸ್ಟರ್’ ಎಂದ ಟ್ರಂಪ್; ಶ್ವೇತಭವನದಲ್ಲಿ AI ಕುರಿತು ಮಹತ್ವದ ಚರ್ಚೆ
    • Trump calls Google CEO Sundar Pichai a ‘monster’ at White House AI meet
    • Rahul Gandhi-Kasab comparison: Congress Seva Dal files cyber complaint against ex-IAF officer
    • ರಾಹುಲ್ ಗಾಂಧಿ-ಕಸಬ್ ಹೋಲಿಕೆ; ನಿವೃತ್ತ ವಾಯುಪಡೆ ಅಧಿಕಾರಿಯ ವಿರುದ್ಧ ಸೈಬರ್ ದೂರು
    • ₹3,000 ಕೋಟಿ ಮೌಲ್ಯದ ಡ್ರಗ್ಸ್ ಜಪ್ತಿ: 5 ಪಾಕ್ ಪ್ರಜೆಗಳ ಬಂಧನ
    Copyright 2026 — ANU News. All rights reserved. Blogsy WordPress Theme